Helical Pile Foundations Engineered for Your Programme
From soil testing to installed and verified piles. Designed in Finland under EN 1090 manufacturing, installed in the UK by UKHelix's local team.
- Up to 1,000+ kN per pile, every pile torque-verified at install
- No spoil, no concrete, no curing time, your build schedule keeps moving
- EN 1090-1 EXC2 manufacturing, ISO 9001 and ISO 14001 quality systems
- 2,500+ projects delivered across 10+ countries, 25 years of pile engineering
Tell us about your project
An engineer will review your details and respond within 1 business day. No sales calls, no spam.
Enquiry received
Thanks. An engineer will review your project and respond within 1 business day. For anything urgent, call 01444 223 755.
Verified performance on commercial projects
Helical pile foundations across solar, energy infrastructure, and live civil environments. Every project documented with installation reports and torque verification.
Cleve Hill Electrical Compound, Kent
Substation foundations for the 373 MW Cleve Hill solar park. Over 1,000 helical piles installed inside the EPC programme window without delaying the wider build.
Oil Pipeline Support Foundations
Heavy-duty pile supports for an export pipeline. Engineered for high vertical and lateral loading in remote terrain, with full installation documentation per pile.
Railway Noise Wall Foundations
Foundations installed alongside live track. No excavation, no spoil, no track closure. Each pile load-tested at install to confirm performance against the design.
Built around your programme, your loads, your site
Helical piles are not just a faster installation method. They are an engineering tool that solves the problems concrete cannot.
Programme certainty
Piles install in dry conditions in days, not weeks. No concrete cure, no frost insulation, no waiting on weather. Your structures can be erected on the same site visit.
Verified loads, not estimated
Every pile is torque-monitored during installation, giving you verifiable load capacity at handover. Pile driving reports are issued for every project, every time.
Sensitive and constrained sites
Live infrastructure, urban access, peat, nature reserves, near waterways. Piles install with minimal disturbance and zero excavation, and are fully removable when the asset is decommissioned.
Single point of accountability
Soil testing, design, manufacturing, installation, and verification handled through one partner. Paalupiste's Finnish factory, UKHelix's UK installation team, one project owner.
Send your project details. Get an engineering response, not a sales pitch.
An engineer reviews every enquiry. If your project is not a good fit for helical piles, you'll be told straight, with the reasoning. If it is, you'll get a clear next step.
-
UK office
UKHelix, Unit 19, Bolney Grange Business Park
Stairbridge Lane, Bolney, RH17 5PB - Phone 01444 223 755 · Mon to Fri 8:00–17:00 (GMT)
- Email [email protected]
Tell us about your project
Engineer response within 1 business day.
Enquiry received
Thanks. An engineer will review your project and respond within 1 business day. For anything urgent, call 01444 223 755.