Skip to content
For UK commercial projects

Helical Pile Foundations Engineered for Your Programme

From soil testing to installed and verified piles. Designed in Finland under EN 1090 manufacturing, installed in the UK by UKHelix's local team.

  • Up to 1,000+ kN per pile, every pile torque-verified at install
  • No spoil, no concrete, no curing time, your build schedule keeps moving
  • EN 1090-1 EXC2 manufacturing, ISO 9001 and ISO 14001 quality systems
  • 2,500+ projects delivered across 10+ countries, 25 years of pile engineering

Tell us about your project

An engineer will review your details and respond within 1 business day. No sales calls, no spam.

Engineer response within 1 business day. UK office: Bolney, West Sussex.

Enquiry received

Thanks. An engineer will review your project and respond within 1 business day. For anything urgent, call 01444 223 755.

1,000+ kN Per-pile load capacity (PRO range)
2,500+ Projects delivered worldwide
EN 1090-1 EXC2 certified manufacturing
25 years Pile engineering since 2001
UK and international references

Verified performance on commercial projects

Helical pile foundations across solar, energy infrastructure, and live civil environments. Every project documented with installation reports and torque verification.

Why commercial clients choose us

Built around your programme, your loads, your site

Helical piles are not just a faster installation method. They are an engineering tool that solves the problems concrete cannot.

Programme certainty

Piles install in dry conditions in days, not weeks. No concrete cure, no frost insulation, no waiting on weather. Your structures can be erected on the same site visit.

Verified loads, not estimated

Every pile is torque-monitored during installation, giving you verifiable load capacity at handover. Pile driving reports are issued for every project, every time.

Sensitive and constrained sites

Live infrastructure, urban access, peat, nature reserves, near waterways. Piles install with minimal disturbance and zero excavation, and are fully removable when the asset is decommissioned.

Single point of accountability

Soil testing, design, manufacturing, installation, and verification handled through one partner. Paalupiste's Finnish factory, UKHelix's UK installation team, one project owner.

Send your project details. Get an engineering response, not a sales pitch.

An engineer reviews every enquiry. If your project is not a good fit for helical piles, you'll be told straight, with the reasoning. If it is, you'll get a clear next step.

  • UK office UKHelix, Unit 19, Bolney Grange Business Park
    Stairbridge Lane, Bolney, RH17 5PB
  • Phone 01444 223 755 · Mon to Fri 8:00–17:00 (GMT)
  • Email [email protected]

Tell us about your project

Engineer response within 1 business day.

No sales calls, no spam. UK office: Bolney, West Sussex.

Enquiry received

Thanks. An engineer will review your project and respond within 1 business day. For anything urgent, call 01444 223 755.